
Total Organic Carbon Analyzer
Installation
Teledyne Analytical Instruments
21
Installation
This manual contains “AS BUILT” drawings and a parts list to aid
in the installation and operation of the analyzer. These drawings should
be referred to when ordering spare parts, operating or servicing the
equipment. See the Appendix for the AS BUILT drawing package.
Installation of the Model 6750 On-line UV/Heated Persulfate TOC
Analyzer includes:
1.
Unpacking
2.
Mounting
3.
Electrical Connections
4.
Gas Connections
5.
Testing the System
3.1 Unpacking the Analyzer
The analyzer is shipped with all the materials you need to install
and prepare the system for operation. Carefully unpack the analyzer and
inspect it for damage. Immediately report any damage to the shipping
agent.
3.2 Mounting the Analyzer
The analyzer is for indoor use in a general purpose area. The
Hazardous Area Option should be used for applications involving
hazardous areas.
The standard model is designed for wall or rack mounting. Figure
3-1 is an illustration of the mounting and Figure 3-2 shows the required
front door clearance. There are four mounting holes – one in each corner
of the enclosure. Refer to “As Built” drawings in the Appendix.
Содержание 6750
Страница 16: ...Introduction Model 6750 Teledyne Analytical Instruments 4 ...
Страница 32: ...Theory of Operation Model 6750 Teledyne Analytical Instruments 20 ...
Страница 40: ...Installation Model 6750 Teledyne Analytical Instruments 28 ...
Страница 91: ...Total Organic Carbon Analyzer Appendix Teledyne Analytical Instruments 79 A 4 AS BUILT Drawings ...
Страница 92: ...Appendix Model 6750 Teledyne Analytical Instruments 80 ...