GW-482S INSTALL ATION GUID E
2
MN100143 Rev B
Before You Install
Before you begin installation:
1. Please review the packing list.
2. Familiarize yourself with the equipment and unit (see pictures below).
Packing List
•
GW-482S Cabinet with EdgeGate 482S VoIP Gateway Board.
•
110/220 V AC/DC A AC power cable (not included with GW-482S-LV-X-G).
•
T wo wall mounting bars.
•
Cardboard mounting template.
•
Set of four NF10-32 nuts, flat washers and spring washers.
•
Set of flanges and Neoprene gaskets for attaching various diameter cable conduits.
•
Set of accessories for attaching and positioning wires.
•
Edge Gate console cable.
Figure 1: The GW-482S Main Components
VoIP Gateway
Board
SFP Transceiver
Cage
LAN and
Phone Patch
Charger
Board
Battery
Compartment
110/220 AC/DC
Adapter and AC
Plug
DC Power Input for
GW-482-LV Units