![Tektronix TCP0020 Скачать руководство пользователя страница 31](http://html1.mh-extra.com/html/tektronix/tcp0020/tcp0020_instruction-manual_1078185031.webp)
Installation
Quick Tip
To maintain measurement accuracy, degauss
your probe in each of these cases:
After you turn on the measurement system
and allow a 20-minute warm-up period
Before you connect the probe to a
conductor
Whenever a current or thermal overload
condition occurs
Whenever you subject the probe to a
strong external magnetic
fi
eld
20 A Current Probes Instruction Manual
7
Содержание TCP0020
Страница 1: ...x TCP0020 TCP2020 50 MHz 20 Amp AC DC Current Probes ZZZ Instruction Manual P071300200 071 3002 00...
Страница 2: ......
Страница 6: ......
Страница 10: ...Table of Contents iv 20 A Current Probes Instruction Manual...
Страница 22: ...Compliance Information xvi 20 A Current Probes Instruction Manual...
Страница 80: ...Specifications Figure 2 Typical insertion impedance versus frequency 56 20 A Current Probes Instruction Manual...
Страница 81: ...Specifications Figure 3 Maximum peak pulse versus pulse width 20 A Current Probes Instruction Manual 57...
Страница 83: ...Specifications Figure 4 Mechanical dimensions 20 A Current Probes Instruction Manual 59...