Performance Verification
P6205 Instruction Manual
4–5
1103 power supply
11801B
oscilloscope
Figure 4–4: Attenuation test setup part 2
11. Adjust the oscilloscope vertical position control if necessary to
center the resulting waveform. Store and then recall the
waveform.
12. Use the cursor measurement capability of the oscilloscope to
display the
D
voltage of the recalled waveform. Measure the
low-frequency portion of the waveform near the back corner.
Record the
D
voltage as V
2
.
13. Use the following equation to calculate the attenuation error:
%error
+
V
2
(10) – V
1
V
1
100
14. Verify that the probe attenuation error is
≤
1.8%.
Rise Time Check
Use the following procedure to confirm that the P6205 probe
performs within its Rise Time specification limits.
NOTE
. If you do not have access to an 11800 Series oscilloscope, a
method for approximating probe rise time using a pulse generator
and a TDS 500 or 11000 Series oscilloscope follows this procedure.
Содержание P6205
Страница 4: ......
Страница 12: ...Service Safety Summary viii P6205 Instruction Manual...
Страница 15: ...Getting Started...
Страница 16: ......
Страница 24: ...Getting Started 1 8 P6205 Instruction Manual...
Страница 25: ...Operating Basics...
Страница 26: ......
Страница 32: ...Operating Basics 2 6 P6205 Instruction Manual...
Страница 33: ...Specifications...
Страница 34: ......
Страница 41: ...Performance Verification...
Страница 42: ......
Страница 57: ...Maintenance...
Страница 58: ......
Страница 65: ...Replaceable Parts...
Страница 66: ......
Страница 72: ...Replaceable Parts 6 6 P6205 Instruction Manual Figure 6 2 P6205 probe optional accessories...
Страница 74: ...Replaceable Parts 6 8 P6205 Instruction Manual...