Installation
Operating Information
2Ć4
The following environmental requirements are provided to ensure proper
operation and long oscilloscope life.
Operating Temperature
Operate the oscilloscope where the ambient air temperature is between 0
_
C
and +50
_
C, and store the oscilloscope at an ambient temperature from
–40
_
C to +75
_
C. After storage at temperatures outside the operating limits,
allow the chassis to stabilize at a safe operating temperature before applying
power.
Ventilation Requirements
The digitizing oscilloscope is cooled by air drawn in and exhausted through its
cabinet side panels by an internal fan. To ensure proper cooling of the
oscilloscope, allow at least two inches clearance on both sides and
on
the bottom of the digitizing oscilloscope. (The feet on the bottom of the
oscilloscope provide the required clearance when set on flat surfaces.) The
top of the oscilloscope does not require ventilation clearance.
CAUTION
If air flow is restricted, the power supply of the digitizing
oscilloscope may temporarily shut down.
Consider the following information when you power up or power down the
oscilloscope, or when power is interrupted due to an external power failure.
Power-Up
Upon power-up, the oscilloscope runs its power-on self check. If the self
check passes, the oscilloscope displays a “passed” status message and a
prompt to press CLEAR MENU to continue. If the self check fails, the oscillo-
scope displays a diagnostic log that identifies the area(s) that failed and a
prompt to press CLEAR MENU to continue. See Section 6,
Maintenance, for
information on diagnostics and fault isolation.
Operating
Environment
Applying and
Interrupting Power
Содержание 410
Страница 9: ...Contents x ...
Страница 13: ...Contents xx ...
Страница 19: ...Safety Summary xx ...
Страница 25: ...Introduction x x ...
Страница 26: ...Specifications ...
Страница 47: ...Operating Information ...
Страница 63: ...Operating Information Operating Information 2Ć16 ...
Страница 64: ...Theory of Operation ...
Страница 68: ...Circuit Description Theory of Operation 3Ć4 ...
Страница 69: ...Performance Verification ...
Страница 81: ...Brief Procedures Performance Verification 4Ć12 ...
Страница 119: ...Performance Tests Performance Verification 4Ć50 ...
Страница 120: ...Adjustment Procedures ...
Страница 147: ...Maintenance ...
Страница 151: ...Maintenance Information Maintenance 6Ć4 ...
Страница 228: ...Troubleshooting TDS 410 TDS 420 TDS 460 Service Manual 6Ć81 J2 Pin 1 Figure 6 38 A02 Display Connector J2 ...
Страница 237: ...Troubleshooting Maintenance 6Ć90 J7 Pin 1 J8 Pin 1 J6 Pin 1 W1 Pin 1 W2 Pin 1 Figure 6 46 A01 Backplane Module ...
Страница 240: ...Options ...
Страница 249: ...Electrical Parts List ...
Страница 251: ...Replaceable Electrical Parts List Electrical Parts List 8Ć2 ...
Страница 252: ...Diagrams ...
Страница 258: ...Diagrams 9Ć6 ...
Страница 259: ...Mechanical Parts List ...
Страница 263: ...Mechanical Parts List 10Ć4 ...
Страница 272: ...TDS 410 TDS 420 TDS 460 Service Manual 10Ć13 1 2 3 4 5 6 7 8 9 10 11 6 3 Figure 10 3 Cables and Routing ...
Страница 275: ...Mechanical Parts List 10Ć16 ...