Brief Procedures
Performance Verification
4Ć4
This procedure uses internal routines to verify that this oscilloscope functions
and passes its internal self tests and signal path compensations. It also
confirms that the oscilloscope was adjusted properly at the time it was last
adjusted. No test equipment or hookups are required.
Verify Internal Adjustment, Self Compensation, and
Diagnostics
Equipment Required:
None.
Prerequisites:
Power on the digitizing oscilloscope and allow a 20 minute
warm-up before doing this procedure.
Procedure:
1.
Verify that internal diagnostics pass: Do the following substeps to verify
that the internal diagnostics passed.
a.
Display the system diagnostics menu:
H
Press SHIFT; then press UTILITY.
H
Repeatedly press the main-menu button System until Diag/Err is
highlighted in the menu that pops up.
H
Repeatedly press the main-menu button Area until All is high-
lighted in the menu that pops up.
b.
Run the system diagnostics: Press the main-menu button Execute;
then press the side-menu button OK Confirm Run Test.
c.
Wait: The internal diagnostics do an exhaustive verification of proper
oscilloscope function. This verification takes up to a minute. While it
progresses, a variety of test patterns flash on screen. When finished,
the resulting status appears on the screen.
d.
Confirm no failures are found: Verify that no failures are found and
reported on-screen.
e.
Confirm the four adjustment sections have passed status:
H
Press SHIFT; then press UTILITY.
H
Press the main menu button System until Cal is highlighted in
the pop-up menu.
H
Verify that the word
Pass appears in the main menu under the
following menu labels: Voltage Reference, High Frequency
Response, Low Frequency Response, and Trigger Skew.
(See Figure 4-2.)
Self Tests
Содержание 410
Страница 9: ...Contents x ...
Страница 13: ...Contents xx ...
Страница 19: ...Safety Summary xx ...
Страница 25: ...Introduction x x ...
Страница 26: ...Specifications ...
Страница 47: ...Operating Information ...
Страница 63: ...Operating Information Operating Information 2Ć16 ...
Страница 64: ...Theory of Operation ...
Страница 68: ...Circuit Description Theory of Operation 3Ć4 ...
Страница 69: ...Performance Verification ...
Страница 81: ...Brief Procedures Performance Verification 4Ć12 ...
Страница 119: ...Performance Tests Performance Verification 4Ć50 ...
Страница 120: ...Adjustment Procedures ...
Страница 147: ...Maintenance ...
Страница 151: ...Maintenance Information Maintenance 6Ć4 ...
Страница 228: ...Troubleshooting TDS 410 TDS 420 TDS 460 Service Manual 6Ć81 J2 Pin 1 Figure 6 38 A02 Display Connector J2 ...
Страница 237: ...Troubleshooting Maintenance 6Ć90 J7 Pin 1 J8 Pin 1 J6 Pin 1 W1 Pin 1 W2 Pin 1 Figure 6 46 A01 Backplane Module ...
Страница 240: ...Options ...
Страница 249: ...Electrical Parts List ...
Страница 251: ...Replaceable Electrical Parts List Electrical Parts List 8Ć2 ...
Страница 252: ...Diagrams ...
Страница 258: ...Diagrams 9Ć6 ...
Страница 259: ...Mechanical Parts List ...
Страница 263: ...Mechanical Parts List 10Ć4 ...
Страница 272: ...TDS 410 TDS 420 TDS 460 Service Manual 10Ć13 1 2 3 4 5 6 7 8 9 10 11 6 3 Figure 10 3 Cables and Routing ...
Страница 275: ...Mechanical Parts List 10Ć16 ...