
TM Palletizing Operator User’s Manual
Product Version: 1.1 Document Version: 1.2
171
Item
Period
Remark
the indication light of the current mode.
Check Robot Mounting Screws
3 months
Refer to 5.2 Assemble TM Palletizing Operator.
Table 32: Summary of the Preventive Maintenance Procedures and Guidelines
Only the legal distributor or authorized service center can repair the TM Robot. Users should not repair
it by themselves.
DANGER:
Before performing maintenance or service record the details of each setting for the robot for
normal operation. Make sure that each setting satisfies the original conditions before
resuming normal operation, including but not limited to:
Safety Software Settings
Safety I/O
Preset operation project
TCP Settings
I/O Settings
I/O Wiring
Содержание TM Palletizing Operator
Страница 40: ...TM Palletizing Operator User s Manual Product Version 1 1 Document Version 1 2 40 ...
Страница 181: ...TM Palletizing Operator User s Manual Product Version 1 1 Document Version 1 2 181 Appendix E Certificate of Compliance ...
Страница 182: ...TM Palletizing Operator User s Manual Product Version 1 1 Document Version 1 2 182 ...
Страница 183: ...TM Palletizing Operator User s Manual Product Version 1 1 Document Version 1 2 183 ...
Страница 185: ...TM Palletizing Operator User s Manual Product Version 1 1 Document Version 1 2 185 ...