User Manual of Solar Intelligent Energy System (SIES)
TBB Power Confidential Page
20
of
66
4. Installation and Connection
Preparation steps:
Read the Installation Guide carefully
Prepare all the tools and materials required during installation.
Review the Safety Instructions in section 1.1.
Be aware of all local safety and electrical code which must be met
Failure to follow these instructions will result in death or serious injury.
4.1 Material list
4.1.1 Standard components provided by TBB Power
The SIES system includes the following basic components:
Energier Pro bi-directional inverter
Solar Mate MPPT charger controller
Smart Box
Plastic bags containing all screw
Battery Temperature Sensor (BTS)
Voltage Sensor (VS)
User’s manual
1. All wiring should be done by qualified personnel to ensure the compliance with all
local applicable installation codes and regulations.
2. Disconnect all AC and DC power sources.
3. Disable and secure all AC and DC disconnect devices and automatic generator
starting devices.
For the user operation safety, cut off the power before installation. Photovoltaic
produce electrical power when exposed to light and can cause an electric shock,
energy, or fire hazard.
Please make sure Smart Box, Energier Pro bi-directional inverter and Solar Mate
MPPT charge controller have been switched off before connection. Otherwise, there
might be a danger of high voltage.