Metal Storage, for Under Hutch
Tools & Hardware Needed
8540-0545
Drill
Robertson # 2
Tape Measure
#10 X 11/16" Oval
Head Screw (5X)
1.
Align the edges of metal
storage 1 with the edges of
bottom laminate of the
overhead storage. Make
sure the edges of the metal
storage and edges of bottom
laminate of the overhead
storage are flush, (Figure 1).
2.
Attach the Metal Storage in
the underside of Overhead
Storage/Hutch using (5)
#10
x 11/16" Oval Head Screws.
3.
Align the edges of the metal
storage 2 with the edge of
the metal storage 1 and the
front edge of bottom
laminate of the overhead
storage.
4.
Repeat Step 2.
METAL STORAGE 1
METAL STORAGE 2
#10 x 11/16” OVAL HEAD SCREW
OVERHEAD STORAGE/HUTCH
1
2
1
3
4
Flush edge of metal storage
with the edge of the laminate
1
3
1
4
2
3
Flush edge of metal storage
with the edge of the laminate
and metal storage
3
2
Figure 1
Figure 2
3
4
May 2023
halifax 48
Содержание Halifax
Страница 1: ...Halifax installation guide May 2023...
Страница 55: ...tayco com 05 23...