11 COMMISSIONING THE SYSTEM, INCLUDING P.S.E.
•
The commissioning of this fire alarm system should be performed by a qualified commissioning engineer.
•
The system layout drawing should be checked for accuracy & stored in a safe place, accessible to any fire officer.
•
The system set-up data chart (GLT.MAN-102, section 9) should be checked for accuracy.
•
The fire alarm log book contact details should be checked for completeness.
•
The system should be checked in accordance with EN54-1 26.2 for compliance with the recommendations.
•
The insulation of cables should be checked in accordance with EN54-1 26.3 for compliance.
•
The Earthing should be checked in accordance with EN54-1 26.4 for compliance.
•
The PSE mains feed from a 3A spur should be checked.
•
The PSE Charger voltage should be checked & adjusted if necessary (27.8V with batteries disconnected).
•
The battery voltage should be checked (should be between 24 & 27V)
•
The entire system should be checked in accordance with EN54-1 26.5 for satisfactory operation.
•
Any deviations from EN54-1 26.6 should be listed in the Certificate of Installation & Commissioning.
•
The Certificate of Installation & Commissioning should be completed, and the whole user manual passed to the
relevant person on site. (They should be given a brief training on the basic operation of the FACP)
11.1 INSTALLATION & COMMISSIONING CERTIFICATE
Before this User Manual is handed over to the relevant person(s) on site, the following certificate must be completed by
the installation/commissioning engineer. The System Set-up Data Chart should also be completed on Page 13 as should
the relevant parts of the Log Book section on Page 14.
Содержание Premier SX
Страница 1: ...35 0 5 6 5 50 21752 3 1 86 5 0 18 0 17 1 1 8 2 22...
Страница 17: ...35 0 5 6 5 50 21752 3 1 167 7 21 0 18...