Solo Innova Instructions 1-800-782-9927 Version 01-18
Tarm Biomass · 4 Britton Lane · Lyme, NH 03768
2.0
Product Description and Requirements for Safe Operation
This section presents a general overview of the boiler and what will be required to operate it safely.
2.1 Boiler Overview
2.1.1 Cut-away View
Product Description and Requirements for Safe Operation > Boiler Overview Page 3
7
8
9
10
11
12
13
14
1
2
3
4
5
6
1. Control Panel
2. Load Door
3. Primary Air Control
4. Secondary Air Control
5. Ash Door
6. Sight Glass
7. Exhaust Stack
8. Clean-Out Cover
9. Draft Fan
10. Boiler Serial Number Plate
11. Flue Gas Turbulators
12. Heat Exchanger Pipes
13. Firebox
14. Gasification Tunnel