Solo Innova Instructions 1-800-782-9927 Version 01-18
Tarm Biomass · 4 Britton Lane · Lyme, NH 03768
21
Boiler Installation & Start-up > Setting the Boiler
Page 22
Install Fan Insulation Box
22
23
24
25
Install Insulation Blanket
Cut Holes for
Immersion Wells
Cut Out Square
Above Clean-
Out Cover. This
will be used
Later
Remove Supply Pipe Assembly
from Boiler
Install Supply Pipe Assembly.
It can be Installed on the Right
or Left Hand Side.