
6-20
TROUBLESHOOTING
lowering the boom to
the ground
If the hoe attachment must be lowered to the
ground while the engine is stopped, use the
following procedure.
Procedure 1 (when engine can be started)
Perform this operation within 10 minutes
after the engine stopping.
1. Sit at the operator’s seat.
2. Turn the starter switch to the ON position.
3. Lower the safety lock lever to the unlock
position
4. Slowly push the operating lever forward to
lower the boom.
Procedure 2 (when engine cannot be
started)
This operation is dangerous and requires
experience. Ask your sales or service dealer
for it.
Warning
• Stop the engine and allow the machine
to cool down before performing
maintenance.
· The engine and the hydraulic system
and many other parts of the machine
are hot immediately after the engine is
stopped. Touching these parts will
cause burns.
· The hydraulic oil is also hot and under
high pressure immediately after the
engine is stopped.
Be careful when loosening the caps or
plugs. Working on the machine under
these conditions could result in burns
or injuries due to the hot oil spurting
out.
• Keep away from the working area when
the hoe attachment is lowered. You may
be hit by dirt falling out of the bucket or
the hoe attachment as it drops.
• Stand in a position away from danger of
lowering boom and loosen the hose nut.
Otherwise, you could be hit by the
boom.
lowering the boom to the ground
• Do not loosen or remove the hoses not
located in the specified places. Oil may
spurt out if wrongly handled.
2-Piece boom
1. Place a pan under the hose to catch the
waste oil.
2. Hold the hose fitting (1) with a wrench and
loosen the hose nut (2) with another
wrench.
3. The oil in the boom cylinder is drained and
the hoe attachment is lowered.
4. After the hoe attachment is lowered to the
ground, check the safety and stability of
the machine.
5. Hold the hose fitting (1) with a wrench and
tighten the hose nut (2) with another
wrench.
· Tightening torque: 24.5 to 29.4 N·m
(18.1 to 21.7 ft-lb.)
Содержание TB285
Страница 1: ......
Страница 10: ...0 8...
Страница 11: ...1 1 Safety...
Страница 44: ...1 34 Safety Safety signs decals...
Страница 45: ...1 35 Safety Safety signs decals...
Страница 46: ...1 36 Safety Safety signs decals...
Страница 47: ...1 37 Safety Safety signs decals...
Страница 48: ...1 38...
Страница 49: ...2 1 Controls...
Страница 103: ...3 1 Operation...
Страница 131: ...4 1 Transport...
Страница 135: ...4 5 Transport Hoisting the machine...
Страница 137: ...5 1 Maintenance...
Страница 165: ...5 29 MEMO...
Страница 193: ...5 57 Memo...
Страница 205: ...6 1 Troubleshooting...
Страница 213: ...6 9 Memo...
Страница 226: ...6 22...
Страница 227: ...7 1 Specifications...
Страница 230: ...7 4 Specifications Machine dimensions Mono boom Machine dimensions...
Страница 232: ...7 6 Specifications Machine dimensions 2 Piece boom...
Страница 234: ...7 8 Specifications Operating ranges Mono boom Operating ranges...
Страница 236: ...7 10 Specifications Operating ranges 2 Piece boom...
Страница 238: ...7 12 Memo...
Страница 240: ...7 14 Specifications Standard arm TB285 Lifting Capacities...
Страница 241: ...7 15 Specifications Lifting Capacities Standard arm TB285...
Страница 242: ...7 16 Specifications Middle arm TB285 Lifting Capacities...
Страница 243: ...7 17 Specifications Middle arm TB285 Lifting Capacities...
Страница 244: ...7 18 Specifications Long arm TB285 Lifting Capacities...
Страница 245: ...7 19 Specifications Long arm TB285 Lifting Capacities...
Страница 246: ...7 20 Specifications Standard arm TB290 Lifting Capacities...
Страница 247: ...7 21 Specifications Lifting Capacities Standard arm TB290...
Страница 248: ...7 22 Specifications Middle arm TB290 Lifting Capacities...
Страница 249: ...7 23 Specifications Middle arm TB290 Lifting Capacities...
Страница 250: ...7 24 Specifications Long arm TB290 Lifting Capacities...
Страница 251: ...7 25 Specifications Long arm TB290 Lifting Capacities...
Страница 252: ...7 26 Specifications Lifting Capacities 2 Piece boom TB285 Equipped with Extra weight...
Страница 253: ...7 27 Specifications Lifting Capacities 2 Piece boom TB285 Equipped with Extra weight...
Страница 254: ...7 28 Specifications Lifting Capacities 2 Piece boom TB290 Equipped with Extra weight...
Страница 255: ...7 29 Specifications Lifting Capacities 2 Piece boom TB290 Equipped with Extra weight...
Страница 256: ...7 30...
Страница 257: ...8 1 Options...