
5-61
MAINTENANCE
Installation
when required
1. Set the O-ring (4) on the bucket as shown
on the figure above.
2. Align the pin hole (A) on the bucket with
the pin hole on the arm (5), and install the
pin (2).
3. Operate the cylinder, align the pin hole (B)
on the bucket with the pin hole on the link
arm (6), and install the pin (2).
4. Align the turn prevention holes, and then
install the bolt (1) and the nut. Be sure to
leave a gap of about 0.5 to 1 mm (0.02 to
0.04 in.) between the nut and bucket
bush, or the nut will come loose.
5. Adjust the gap between the bucket and
the arm.
Refer to “Adjusting the gap between the
bucket and arm (If equipped)” on page
5-62.
6. Slide the O-ring (4).
Replacing the pin seal
1. Set the pin seal (3) in the direction shown
on the figure above.
2. Use a mallet to slowly press the pin seal
in. Be careful not to damage the seal.
Содержание TB285
Страница 1: ......
Страница 10: ...0 8...
Страница 11: ...1 1 Safety...
Страница 44: ...1 34 Safety Safety signs decals...
Страница 45: ...1 35 Safety Safety signs decals...
Страница 46: ...1 36 Safety Safety signs decals...
Страница 47: ...1 37 Safety Safety signs decals...
Страница 48: ...1 38...
Страница 49: ...2 1 Controls...
Страница 103: ...3 1 Operation...
Страница 131: ...4 1 Transport...
Страница 135: ...4 5 Transport Hoisting the machine...
Страница 137: ...5 1 Maintenance...
Страница 165: ...5 29 MEMO...
Страница 193: ...5 57 Memo...
Страница 205: ...6 1 Troubleshooting...
Страница 213: ...6 9 Memo...
Страница 226: ...6 22...
Страница 227: ...7 1 Specifications...
Страница 230: ...7 4 Specifications Machine dimensions Mono boom Machine dimensions...
Страница 232: ...7 6 Specifications Machine dimensions 2 Piece boom...
Страница 234: ...7 8 Specifications Operating ranges Mono boom Operating ranges...
Страница 236: ...7 10 Specifications Operating ranges 2 Piece boom...
Страница 238: ...7 12 Memo...
Страница 240: ...7 14 Specifications Standard arm TB285 Lifting Capacities...
Страница 241: ...7 15 Specifications Lifting Capacities Standard arm TB285...
Страница 242: ...7 16 Specifications Middle arm TB285 Lifting Capacities...
Страница 243: ...7 17 Specifications Middle arm TB285 Lifting Capacities...
Страница 244: ...7 18 Specifications Long arm TB285 Lifting Capacities...
Страница 245: ...7 19 Specifications Long arm TB285 Lifting Capacities...
Страница 246: ...7 20 Specifications Standard arm TB290 Lifting Capacities...
Страница 247: ...7 21 Specifications Lifting Capacities Standard arm TB290...
Страница 248: ...7 22 Specifications Middle arm TB290 Lifting Capacities...
Страница 249: ...7 23 Specifications Middle arm TB290 Lifting Capacities...
Страница 250: ...7 24 Specifications Long arm TB290 Lifting Capacities...
Страница 251: ...7 25 Specifications Long arm TB290 Lifting Capacities...
Страница 252: ...7 26 Specifications Lifting Capacities 2 Piece boom TB285 Equipped with Extra weight...
Страница 253: ...7 27 Specifications Lifting Capacities 2 Piece boom TB285 Equipped with Extra weight...
Страница 254: ...7 28 Specifications Lifting Capacities 2 Piece boom TB290 Equipped with Extra weight...
Страница 255: ...7 29 Specifications Lifting Capacities 2 Piece boom TB290 Equipped with Extra weight...
Страница 256: ...7 30...
Страница 257: ...8 1 Options...