TB9100/P25 CG Installation and Operation Manual
Technical Description
107
© Tait Electronics Limited January 2007
Figure 8.4
PA high-level block diagrams
6W
Board
Control Board
60W
Board
60W
Board
Ambient Air
Temperature
Sensor
Board
Splitter
Boar
d
Combiner
Boar
d
Low-Pass
Filter
&
Directional
Coupler
Board
RF I/P +
PA Key
RF O/P
28VDC
I/P
DC
DC
DC
RF
RF
RF
RF
RF
RF
Control &
Monitor
Control &
Monitor
Control &
Monitor
System
Control
Bus
100W 28V PA
6W
Board
Control Board
Boost Regulator
60W
Board
Ambient Air
Temperature
Sensor
Board
Low-Pass
Filter
&
Directional
Coupler
Board
RF I/P +
PA Key
RF O/P
12VDC
I/P
12VDC O/P
(Reciter)
DC
28VDC
28VDC
RF
RF
Control &
Monitor
Control &
Monitor
Control &
Monitor
System
Control
Bus
50W 12V PA
Содержание P25 CG
Страница 60: ...60 Installation TB9100 P25 CG Installation and Operation Manual Tait Electronics Limited January 2007 ...
Страница 72: ...72 Maintenance TB9100 P25 CG Installation and Operation Manual Tait Electronics Limited January 2007 ...
Страница 76: ...76 Troubleshooting TB9100 P25 CG Installation and Operation Manual Tait Electronics Limited January 2007 ...
Страница 120: ...120 Technical Description TB9100 P25 CG Installation and Operation Manual Tait Electronics Limited January 2007 ...
Страница 146: ...146 TaitNet P25 Glossary TB9100 P25 CG Installation and Operation Manual Tait Electronics Limited January 2007 ...