40
Installation
TB9100/P25 CG Installation and Operation Manual
© Tait Electronics Limited January 2007
3.4
Setting Up on the Bench
Before installing the base station in the on-site cabinets or racks, it is a good
idea to set it up on the bench. You can then verify that it is operating
correctly, and tune it if necessary. You can also customize its configuration
for the installation it is destined for and verify that the configuration is
correct. An important aspect of that configuration is the base station’s IP
address. The base station comes with a default IP address but needs to be
given the IP address required for its position in the TaitNet P25 Network.
Using a Calibration
and Test Unit
A Calibration and Test Unit (CTU) can be of great assistance when
confirming operation and when tuning and calibrating the base station.
Connect the CTU to the base station or console gateway as follows:
Figure 3.3
TB9100 to CTU connections
b
Reciter rear
f
DC input connector
c
9-way digital I/O / serial connector
g
RJ-45
d
Ethernet RJ-45
h
9-way port (male)
e
Analog RJ-45 (audio)
i
3-wire cable (TXD,RXD,GRND)
Hub
CSS
10-32 VDC
Power
Supply
CTU
b
c
d
h
g
e
f
i
Содержание P25 CG
Страница 60: ...60 Installation TB9100 P25 CG Installation and Operation Manual Tait Electronics Limited January 2007 ...
Страница 72: ...72 Maintenance TB9100 P25 CG Installation and Operation Manual Tait Electronics Limited January 2007 ...
Страница 76: ...76 Troubleshooting TB9100 P25 CG Installation and Operation Manual Tait Electronics Limited January 2007 ...
Страница 120: ...120 Technical Description TB9100 P25 CG Installation and Operation Manual Tait Electronics Limited January 2007 ...
Страница 146: ...146 TaitNet P25 Glossary TB9100 P25 CG Installation and Operation Manual Tait Electronics Limited January 2007 ...