TB9100/P25 CG Installation and Operation Manual
Installation
39
© Tait Electronics Limited January 2007
1.
Cut the tape securing the flaps at the top of the carton and fold them
flat against the sides
b
.
2.
Rotate the carton carefully onto its side
c
and then onto its top
d
,
ensuring that none of the flaps is trapped underneath.
3.
Slide the carton upwards over the foam cushions and lift it away
e
.
Remove the cushion from the bottom of the base station
f
.
4.
Rotate the base station and cushion carefully over the rear of the base
station
g
so that it is the right way up with the cushion on top
h
.
Remove the cushion from the top of the base station
i
.
Disposal of
Packaging
If you do not need to keep the packaging, we recommend that you recycle
it according to your local recycling methods. The foam cushions are CFC-
and HCFC-free and may be burnt in a suitable waste-to-energy combustion
facility, or compacted in landfill.
Figure 3.2
Unpacking the TB9100 base station
b
e
g
f
h
i
c
d
Содержание P25 CG
Страница 60: ...60 Installation TB9100 P25 CG Installation and Operation Manual Tait Electronics Limited January 2007 ...
Страница 72: ...72 Maintenance TB9100 P25 CG Installation and Operation Manual Tait Electronics Limited January 2007 ...
Страница 76: ...76 Troubleshooting TB9100 P25 CG Installation and Operation Manual Tait Electronics Limited January 2007 ...
Страница 120: ...120 Technical Description TB9100 P25 CG Installation and Operation Manual Tait Electronics Limited January 2007 ...
Страница 146: ...146 TaitNet P25 Glossary TB9100 P25 CG Installation and Operation Manual Tait Electronics Limited January 2007 ...