98
Replacing Modules
TB9100/P25 CG Installation and Operation Manual
© Tait Electronics Limited January 2007
2.
Refit the Front Panel
a. Fit the front panel onto the locating pegs on the subrack. Fit the
left end first, followed by the right end, pressing the panel in the
center as shown
b
to secure the spring clip behind the control
panel.
b. Secure the fastener at each end
c
with a quarter turn clockwise.
Align the slot horizontally, then press the fastener in and turn to
lock.
3.
Before powering up the base station, check that all power, RF and
system cables are connected correctly and securely at the rear of the
base station.
Important
When refitting modules, make sure they are fitted correctly
into the subrack and all retaining clamps are securely
tightened. The recommended torque for the retaining
clamp screws is 17lbf·in (1.9N·m). As well as holding the
modules in place, the retaining clamps push the modules
hard against the rear rail of the subrack to ensure a good
ground connection between the modules and subrack.
c
locked
unlocked
b
Содержание P25 CG
Страница 60: ...60 Installation TB9100 P25 CG Installation and Operation Manual Tait Electronics Limited January 2007 ...
Страница 72: ...72 Maintenance TB9100 P25 CG Installation and Operation Manual Tait Electronics Limited January 2007 ...
Страница 76: ...76 Troubleshooting TB9100 P25 CG Installation and Operation Manual Tait Electronics Limited January 2007 ...
Страница 120: ...120 Technical Description TB9100 P25 CG Installation and Operation Manual Tait Electronics Limited January 2007 ...
Страница 146: ...146 TaitNet P25 Glossary TB9100 P25 CG Installation and Operation Manual Tait Electronics Limited January 2007 ...