Page 6
Page 6
Utility Requirements
Revision G Issued May 2022
Page 6
POWER
•
180–264 VAC, 47–63 Hz, and single phase
•
Dedicated 20 A outlet. US sites require an L6-20 outlet.
GAS
Air Supply:
Conditions
•
Must be dry
•
Must be free from oil (0.01 mg/m
3
) and dirt (5 µm)
Dew Point* -10°C or better
Pressure
100 psig (0.7 MPa)
Flow Rate
9.5 scfm (270 L/min)
If using N
2
gas as FCO heater source, air flow rate is 6 scfm (170 L/min).
Separate N
2
gas source must be 70–125 psig and able to sustain a flow
rate of 3.5 scfm (100 L/min)
*TA Instruments recommends purchasing the air dryer to account for the necessary dew point and air
quality.
NEMA L6-20 plug
Содержание RSA-G2
Страница 1: ......
Страница 9: ...Forced Convection Oven with tension clamp Technology 8...
Страница 13: ...IMMERSION TESTING I CLAMPING SYSTEMS...
Страница 15: ...DETA I DIELECTRIC THERMAL ANALYSIS ACCESSORY DETA...
Страница 29: ...tainstruments com 2019 TA Instruments All rights reserved L50027 001...
Страница 30: ...Verso Filler Page z z...
Страница 31: ...n getting Started guide Revision D Issued July 2022...
Страница 99: ...Issued November 2013 Supplement to Getting Started Guide TA Instruments Manual Supplement...
Страница 100: ...Page 2 TA Instruments Manual Supplement This page is intentionally blank...
Страница 113: ...Page 1 Page 1 RSA G2 Solids Analyzer Revision G Issued May 2022 Site Preparation Guide...