Page 11
Page 11
Accessories
Revision G Issued May 2022
Page 11
AIR COOLING SYSTEM REQUIREMENTS
Requirements
•
50 Hz: 207–252 VAC (refer to the serial number plate on the rear of the unit. The
ACS is line frequency specific.)
•
60 Hz: 216–252 VAC (refer to the serial number plate on the rear of the unit. The
ACS is line frequency specific.)
•
8A, 9A, 9.1A, or 11A (refer to the serial number plate on the rear of the unit)
•
US sites require an L6-20 single-phase outlet
•
Gas:
•
Air or nitrogen
•
Pressure: 6.9 bar (100 psig)
•
Flow rate: 200 L/min
•
Temperature: 20–30°C
•
Dew point: Must not exceed the ambient air temperature by more than 5°C.
Specified at operating pressure.
•
Lab Environment: (must be below 25°C):
•
12°C–21°C = Acceptable
•
21°C–24°C = Ideal
•
Leave 20 cm (8 in) of space in the front and back of the ACS for ventilation.
•
4 ft
2
required floor space for the ACS.
Circulator Power Cooling
Gas
LN
2
Fluid
Light Hardware Software Temp Lab
Customer
NEMA L6-20 plug
Содержание RSA-G2
Страница 1: ......
Страница 9: ...Forced Convection Oven with tension clamp Technology 8...
Страница 13: ...IMMERSION TESTING I CLAMPING SYSTEMS...
Страница 15: ...DETA I DIELECTRIC THERMAL ANALYSIS ACCESSORY DETA...
Страница 29: ...tainstruments com 2019 TA Instruments All rights reserved L50027 001...
Страница 30: ...Verso Filler Page z z...
Страница 31: ...n getting Started guide Revision D Issued July 2022...
Страница 99: ...Issued November 2013 Supplement to Getting Started Guide TA Instruments Manual Supplement...
Страница 100: ...Page 2 TA Instruments Manual Supplement This page is intentionally blank...
Страница 113: ...Page 1 Page 1 RSA G2 Solids Analyzer Revision G Issued May 2022 Site Preparation Guide...