RSA-G2 Getting Started Guide
Page 31
Chapter: 2
Installing the RSA-G2
Unpacking/Repacking the RSA-G2
The instructions needed to unpack and repack the instrument are found as separate unpacking instructions
in the shipping box and in the online documentation associated with the instrument control software. You
may wish to retain all of the shipping hardware, the pallet, and boxes from the instrument in the event you
wish to repack and ship your instrument.
Preparing the System
Before shipment, the RSA-G2 DMA is inspected both electrically and mechanically so that it is ready for
operation upon proper installation. Only limited instructions are given in this manual; consult the online
documentation for additional information. Installation involves the following procedures:
• Inspecting the system for shipping damage and missing parts.
• Choosing a suitable location.
• Connecting the RSA-G2 to a suitable air supply.
• Connecting all cables and lines.
• Connecting the RSA-G2 to the customer line voltage outlet.
• Connecting the RSA-G2 to the controller computer and network.
CAUTION: It is recommended that you have your RSA-G2 unpacked and installed by a TA Instru
-
ments Service Representative. Call for an installation appointment when you receive your instru
-
ment.
MISE EN GARDE: Il est recommandé que le dépotage et l'installation de votre RSA-G2 soient
assurés par un représentant du service d'entretien de TA Instruments. Appelez pour prendre ren
-
dez-vous en vue d'une installation à la réception de votre instrument.
Inspecting the System
When you receive your RSA-G2, look over the instrument and shipping container carefully for signs of
shipping damage, and check the parts received against the enclosed shipping list.
• If the instrument is damaged, notify the carrier and TA Instruments immediately.
• If the instrument is intact but parts are missing, contact TA Instruments.
Содержание RSA-G2
Страница 1: ......
Страница 9: ...Forced Convection Oven with tension clamp Technology 8...
Страница 13: ...IMMERSION TESTING I CLAMPING SYSTEMS...
Страница 15: ...DETA I DIELECTRIC THERMAL ANALYSIS ACCESSORY DETA...
Страница 29: ...tainstruments com 2019 TA Instruments All rights reserved L50027 001...
Страница 30: ...Verso Filler Page z z...
Страница 31: ...n getting Started guide Revision D Issued July 2022...
Страница 99: ...Issued November 2013 Supplement to Getting Started Guide TA Instruments Manual Supplement...
Страница 100: ...Page 2 TA Instruments Manual Supplement This page is intentionally blank...
Страница 113: ...Page 1 Page 1 RSA G2 Solids Analyzer Revision G Issued May 2022 Site Preparation Guide...