34
| Start-up, adjustments, use, commissioning and unit in hipernation
• Printed form for Commissioning protocol - Annex 9
• Test report because the unit was delivered with Systemair control system – Annex 10
• Short description about the main components in the control system —Annex 11
• Wiring diagrams about the Systemair control system - Annex 12
• Operator’s guide for the Systemair control panel - Annex 13
K.2
Documentation is available for download
From
Your local Systemair company is able to provide the below-mentioned documents and data.
Common
• This User Manual in an order specific version
• Declaration of conformity with production number for this unit and the unique technical data with production number
for this unit
• Commissioning Protocol as a Word-file for modification by the installer
• Wiring diagrams about the Systemair control system
• Operator’s Guide for the Systemair control system with Access controller and Sysemair NaviPad control panel
Components in the air handling unit
• Control system for rotary heat exchanger
• EC motors
• Damper motors
• Filter guards
• Temperature sensors
• Fire thermostats
• Smoke detectors
• Pressure transmitters
• Valves
• Valve motors
• Humidity sensors
• CO2 sensor
• Control panel
• Humidifier
• Manuals about configuration of Systemair control systems— Access
• Information about connection of Systemair control systems to Building Management Systems
• Other
K.3
Start-up by installer
All protection and safety measures must be met before start-up of the unit. The mains supply voltage must also be
checked too. The mains supply voltage must be measured at the supply terminals in the cabinet.
K.3.1
Checklist, relevant values
K.3.1.1 Checklist prior to start-up
• Is the unit assembled correctly with its functions in the correct order? See Annex 2.
• Are the sections and ducts assembled correct? See annex i.
• Check that fans are not damaged after transportation and installation.
• Is the rotary exchanger turning freely?
• Are safety guards installed correctly?
• If the unit includes integrated heat pump, check whether it is installed and supervised by qualified service personnel.
output |