Instructions for unloading on the site as well as installation and connection |
21
Holes for screws are factory made in the vertical profile
of one section and an inserts with thread — RIVNUTS —
have been factory mounted in the corresponding vertical
profile of the other section.
Insert the screw in the hole and tighten the screw. It might be useful to pull the sections fully together prior to tighten-
ing the screws.
Bracket inside a section. A similar bracket is installed in
the next section. This is the bracket in the Geniox sizes 10
and 18
Press the sections hard together so that the rubber pro-
files are so flat that the iron frames of the two sections
are joined. Strap with tensioner is suitable for pressing
the sections hard together..
Note! To avoid any load and
stress on the vertical profiles the strap must be carefully
placed on the bottom profiles of the unit.
The sections must then be locked permanently together
with 8 mm bolts. Nut with threat is installed from the fac-
tory in one of the brackets
Note! Do not pull the sections together by tensioning
the 8 mm bolts. Use the strap for this purpose.
output |