![Symmetricom TimeHub 5500 Скачать руководство пользователя страница 97](http://html.mh-extra.com/html/symmetricom/timehub-5500/timehub-5500_user-manual_1419592097.webp)
097-55501-01 Revision M – January 2009
TimeHub 5500 User’s Guide
97
Chapter 3 Installing the TimeHub 5500
Rack Mounting the TimeHub 5500
If you are installing the wire-wrap panel delivered with the Master shelf (shown in
), mount the panel in the rack
after
you install the shelf. Mount the panel
above or below the shelf, leaving enough space (at least 1 RU) for cable
management above and below the wire-wrap panel. A Cable Management kit is
available in 1U or 2U heights (093-55595-11 and 093-55595-12, respectively) to
complete the installation. A rack extender bracket is included for 23-inch racks.
illustrates one way to assemble the wire-wrap panel with the Cable
Management kit and the rack extender bracket.
You can mount the wire-wrap panel with either the connectors or the wire-wrap pins
facing the front of the rack; follow your company procedures.
Figure 3-2.
High-Density Wire-wrap Panel (Front and Rear)
Recommendation:
For most applications, Symmetricom
recommends that you install the Wire-wrap panel and Cable
Management kits on the
rear
of the rack rails. This improves the cable
routing from the rear of the shelf to the wire-wrap panel.
Содержание TimeHub 5500
Страница 1: ...TimeHub 5500 User s Guide Revision M January 2009 Part Number 097 55501 01 ...
Страница 12: ...List of Figures 12 TimeHub 5500 User s Guide 097 55501 01 Revision M October 2008 ...
Страница 14: ...List of Tables 14 TimeHub 5500 User s Guide 097 55501 01 Revision M January 2009 ...
Страница 46: ...46 TimeHub 5500 User s Guide 097 55501 01 Revision M January 2009 Chapter 1 Description TimeScan THC Software ...
Страница 280: ...280 TimeHub 5500 User s Guide 097 55501 01 Revision M January 2009 Chapter 6 Specifications Factory Default Values ...