Installation and electrical connections
Page 19/52
Installation, commissioning and operating instructions
SYCLOPE
TERE’O Touch
®
CU/PT
10)
Connecting measurement inputs
The
TERE’O Touch
®
has three inputs :
➢
POT input connection for pH sensor.
➢
In1 input 4-20mA input Insulated for temperature measurement.
➢
In2 input 4-20mA Isolated for chlorine or bromine measurement
a)
pH input
Use the shield cable supplied with your sensor.
Strip the wires for 7 mm.
Pass the cable through a cable gland.
Wire the center conductor to
Pot
(1) point.
Wire the braided shield to
Ref
(2) point.
Tighten the cable gland to ensure tightness
In some cases the pH
input may be in BNC
version outside the box
b)
Temperature input
Use a 2 points cable.
Strip the wires for 7 mm.
Pass the cable through a cable gland.
Wire the first point in the input
Iin1 (+) (6)
.
Wire the second point in the input
Iin1 (-) (7)
.
Tighten the cable gland to ensure tightness.
pH sensor
Temperature sensor