![Swann AMI Codes-II Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/swann/ami-codes-ii/ami-codes-ii_operators-manual_1411948036.webp)
34
A-96.250.571 / 050517
AMI Codes-II
Instrument Setup
4.
Instrument Setup
After installation according to checklist proceed as following:
4.1.
Prepare Reagents
1
Refill or replace Reagents, p. 43
2
Insert the suction lances into the canisters.
4.2.
Peristaltic Pump
The instrument is delivered with opened occlusion frames.
1
Activate the peristaltic pump tubes by closing the occlusion
frame [B].
A
B
C
D
Turn to lock
Occlusion frame
Rotor
Pump tube
A
B
D
C