SC823M Chassis Manual
6-8
Figure 6-6. Installing into a Rack
Ball-Bearing
Shuttle
Standard Chassis Installation
Stability hazard.
The rack stabilizing mechanism must be in place, or the rack
must be bolted to the floor before you slide the unit out for servicing. Failure
to stabilize the rack can cause the rack to tip over.
Installing the Chassis into a Rack
1. Extend the outer rails as illustrated above.
2. Align the inner rails of the chassis with the outer rails on the rack.
3. Slide the inner rails into the outer rails, keeping the pressure even on both
sides. When the chassis has been pushed completely into the rack, it should
click into the locked position.
4. Optional screws may be used to hold the front of the chassis to the rack
Note:
The figure above is for illustrative purposes only. Always install servers to
the bottom of the rack first.
Caution:
Do not pick up the server with the front handles. They are designed
to pull the system from a rack only.
Содержание CSE-823MTQ-R700LPB
Страница 5: ...v Preface Notes...
Страница 12: ...SC823M Chassis Manual 1 4 Notes...
Страница 32: ...2 20 SC823M Chassis Manual Notes...
Страница 60: ...SC823M Chassis Manual 5 22 Notes...
Страница 70: ...SC823M Chassis Manual 6 10 Notes...
Страница 72: ...SC823M Chassis Manual A 2 Notes...
Страница 78: ...B 6 SC825M Chassis Manual Notes...