NOTE: DIAGRAMS & ILLUSTRATION ARE NOT TO SCALE.

9

Figure 5

8d Nail

Top Spacer

The firebox may be positioned and then the 

framing built around it, or the framing may 

be constructed and the firebox positioned into 

the opening.

Usually, no special floor support is needed for 

the firebox, however, to be certain:

1.

 Estimate the total weight of the firebox 

system and surround materials such as 

marble, brick, stone, etc., to be installed 

(see Product Referance Table on 

Page 10 

for appliance weight).

2.

 Measure the square footage of the floor 

space to be occupied by the system and 

surrounds.

3.

 Note the floor construction, i.e. 2" x 6", 2" x 

8" or 2" x 10", single or double joists, type 

and thickness of floor boards.

4.

 Use this information and consult your lo-

cal building code to determine if you need 

additional support.

If you plan to raise the firebox, build the plat-

form assembly then position firebox on top. 

Secure the platform to the floor to prevent 

possible shifting.

Firebox Installation

Step 1. 

Frame these appliances as illustrated in 

Figures 7 through 9

.  All framing details must 

allow for a minimum clearance to combustible 

framing members as shown in 

Figures 2 through 4

.   

Also refer to appliance specifications on 

Page 

10 

. Headers may be in direct contact with the 

appliance top spacers but must not be sup-

ported by them or notched to fit around them.  

All construction above the appliance must be 

self supporting,  

DO NOT

 

USE THE APPLIANCE 

FOR STRUCTURAL SUPPORT. 

NOTE:

 The framed depth from a framed wall, 

must always be measured from a finished 

surface.  If a wall covering such as drywall is 

to be attached to the rear wall, then the depth 

must be measured from the drywall surface.  

It is important that this dimension be exact.

Step 2.

 Level the firebox by checking the top 

edge of the firebox. Shim if necessary.

Step 3.

 Fireplace should be secured to side 

framing members using the full length nailing 

tabs at the top and bottom of the fireplace front 

face.  Use 8d nails (see 

Figure 5

).

Firebox Framing

Construct firebox framing following 

Figures 7 

through 9

  and 

 Table 1

 on 

Page 11

  for your 

specific installation requirements. Refer to 

Figure 6

 on 

Page 10

 for firebox dimensions.

The firebox may be installed directly on a 

combustible floor or raised on a platform of 

an appropriate

 

height. When the appliance is 

installed directly on carpeting, vinyl tile or other 

combustible material, other than wood flooring, 

the appliance shall be installed on a metal or 

wood panel extending the full width and depth of 

the appliance.   Be sure firebox rests on a solid 

continuous floor or platform with appropriate 

framing for support and so that no cold air can 

enter room from under the firebox.

NOTE:

 The nailing flange and the area directly 

behind the nailing flange is exempt from the 

clearances described on the firebox clearance 

label.

Step 4.

 To safely operate the heater with con-

sideration of the mantel clearances the hood 

must be installed.

       

CAUTION

Do not block the heat-circulating 

air inlets and outlets on these 

fireboxes. Doing so may create a 

potential fire hazard.

       

IMPORTANT

Under no circumstances shall the 

firebox top spacers be removed or 

modified (see Figure 5). The header 

may be in direct contact with the top 

spacers but must not be supported 

by them, notched or altered to fit 

around them.

Содержание VRT3132F

Страница 1: ...3132F VRT3136WS VRT3136F VRT3142WS VRT3142F WARNING If the information in this manual is not followed exactly a fire or explosion may resultcausingpropertydamage personalinjury or loss of life FOR USE...

Страница 2: ...perating the heater Installation and repair should be done by a qualified service person The heater should be inspected before use and at least annually by a professional service person More frequent...

Страница 3: ...UCTIONS BEFORE BEGIN NING YOUR INSTALLATION Packaging List Vent Free Gas Firebox Hood Installation and Operation Instructions GENERAL INFORMATION TheseVent Freefireboxenclosuresaredesigned toacceptall...

Страница 4: ...maximum BTU Hr the space can support with the actual amount of BTU Hr used __________ BTU Hr max the space can support __________ BTU Hr actual amount of BTU Hr used Example 61 440 BTU Hr max the spac...

Страница 5: ...ree firebox must be kept clear and free from these combustible materials WARNING Do not use a blower insert heat exchanger insert or other acces sory not approved for use with this appliance WARNING D...

Страница 6: ...bstruct vent openings for heat circulating models NOTE To avoid heat related finish damage we recommend the use of high temperature paint rated 175 F or higher on the underside of the mantel Clearance...

Страница 7: ...ch as carpeting vinyl tile etc a metal or wood barrier covering the entire bottom surface must be used Combustible Mantel and Trim Clearance VRT3100 Series Models WITH Hood Installed Hood is required...

Страница 8: ...ifferent sequence Step 1 Position firebox prior to framing or into prepared framing Step 2 Field wire the main power supply to the appliance if a blower kit is to be installed at the time of installat...

Страница 9: ...hed surface If a wall covering such as drywall is to be attached to the rear wall then the depth must be measured from the drywall surface It is important that this dimension be exact Step 2 Level the...

Страница 10: ...37 1 4 947 23 1 2 597 20 508 3 77 7 3 8 188 15 7 8 404 7 1 2 191 12 305 1 3 8 35 5 1 2 140 30 3 8 772 29 5 8 753 VRT3142WS VRT3142F 42 1067 24 610 47 3 4 1213 37 1 4 947 29 1 2 749 20 508 3 77 7 3 8...

Страница 11: ...creen and rod assemblies see Figure 10 Framing Dimensions Opening VRT3132WS VRT3132F VRT3136WS VRT3136F VRT3142WS VRT3142F A 38 1 4 972 42 1 4 1073 48 1 4 1226 B 40 1 4 1022 40 1 4 1022 40 1 4 1022 C...

Страница 12: ...NG Junction Box Factory Wired Blower Tab Intact Plug blower into this receptacle Ground Green Wall mounted ON OFF Blower Switch or Variable Speed Control Switch Ground HOT SIDE OF RECEPTACLE A ON OFF...

Страница 13: ...igure 16 Step3 Looselytieaknotinthepowercordtotakeupslack seeFigure19 Step 4 Locate the tabs shown in Figure 20 Position the blower assembly so that the tabs located on the cabinet base are seated in...

Страница 14: ...The strain relief bushing not supplied should be pressed into the knock out on J box cover around the Romex thiswillprovideprotectiontothewiresandpreventsstrain against connections from J box See Wir...

Страница 15: ...xtension combustibles allowed No carpet or vinyl Combustible Platform SIDE VIEW Firebox Floor Combustible Wall Figure 23 Raised Hearth Extension Non Combustible Wall see Figure 4 Fireplace Opening Fro...

Страница 16: ...igned to be used when an optional FBK 100 or FBK 200 Blower Kit is to be installed Forced Air Blower Kits Cat No ModelNo Description 80L84 FBK 100 Blower Standard single speed 80L85 FBK 200 Blower Var...

Страница 17: ...e or personal injury NOTE The model and serial number can be found on the rating label located on the bottom left front corner of the appliance If you encounter any problems or have any questions conc...

Страница 18: ..._______________ ______________________________________________________ ______________________________________________________ ______________________________________________________ ___________________...

Страница 19: ...natural or propane gas only Burning conventional fuels such as wood coal or any other solid fuel will cause damage to the Product will produce excessive temperatures and could result in a fire hazard...

Страница 20: ...HP reserves the right to make changes at any time without notice in design materials specifications prices and the discontinuance of colors styles and products Consult your local distributor for firep...

Отзывы: