![Sunways NT 2600 Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/sunways/nt-2600/nt-2600_user-manual_1401174014.webp)
2.1
Safety information
!
100
Electrical safety
Before opening the cabinet, the solar
inverter must be disconnected from the
grid and from the PV generator.
The solar inverter conducts a hazardous
voltage internally and at the connectors of
the PV generator for approx. five minutes
after isolation from the PV generator and
the grid. The energy storage capacitors are
only fully discharged after this period.
After disconnecting the solar inverter from
the grid and PV generator, you must wait
at least five minutes before opening the
solar inverter.
Mechanical safety
During installation, make sure that the
cables or connection lines fitted to the
solar inverter are securely laid and that
suitable mechanical cable supports
(cable ducts etc.) are used.
Содержание NT 2600
Страница 2: ...SOLAR INVERTERS User Manual for Sunways Solar Inverters NT 6000 NT 5000 NT 4000 and NT 2600...
Страница 6: ...1 0 General information 92...
Страница 13: ...200 2 0 Information on installation 99...
Страница 38: ...3 0 Information on operation 124...
Страница 66: ...4 0 Appendix 152...
Страница 85: ...200...