13
Copyright © 2012 Suntrap Pty Ltd All rights reserved ABN 87 117 052 856
7. Connections to the Suntrap Solar Collectors
•
Using 19mm thickness insulation, connect a
15mm copper pipe from the middle pipe
connection on the Solar Tank (point G) and
connect to the solar collector outlet (Point K)
•
The Air Vent and Solar Temperature ‘collector’
sensor assembly is connected into the solar
collector outlet (Point K)
Important Note:
The Air Vent and Solar Temperature sensor
assembly must be installed on the outlet side of
the Solar Collector (Point K)
•
Using 19mm thickness insulation, connect a
15mm copper pipe from the Solar Control Kit
(point E) to the inlet side of the solar
collectors (point L)
Water Flow
Water Flow
L
K
Roof Solar Collector Sensor leads and Cable Ties
Solar Control Unit indicator panel
Solar Control Unit showing power plug, socket for pump, and
Solar Tank sensor leads (for Upper and Lower tank positions)
Underside of Solar Control Unit showing temperature
sensor leads and solar collector (roof) sensor plug position
6. Completed views of assembled parts (cont)
Access to optional connections to clean relay contacts
for timed 11pm to 6am boost element control.
(See Note in Section 13, page 19)