ACCESSORIES AND THEIR ASSEMBLY
07
20
7.1) STAND
1)
Assembling Upper Thread Stand
7.2) OP BOX
30
Thread holding bar
Supporter
Spool plate
Bolts for supporter
①
Sequin cable connection (optional)
: When the sequin device is installed, the sequin cable shall
be connected.
②
Thread sensing board cable connection
③
Joint board cable connection
①
②
③
Содержание SWF/TA-WJ614-100
Страница 51: ...52 6 Frill bobbin embroidery User direction 7 Standing bobbin embroidery User direction ...
Страница 60: ...61 11 1 2 Outside the Control Box Terminal for tape reader and winder Fuse for picker solenoid power ...
Страница 63: ...64 11 4 TRIMMING MOTOR DRIVE DC power Signal cable Motor control cable AC power ...