15
4.2) ELECTRICITY INSTALLATION ENVIRONMENT
4.2.1) Input voltage (to be adjusted at installation)
3-Phase 200V, 220V, 240V, 340V, 380V, 415V (50~60Hz)
4.2.2) Allowed voltage range
Within 10% of the voltage set
4.2.3) Electric capacity and power consumption
3KVA 1.4
∼
1.6KW
4.2.4) Insulation resistance
Over 10M ohms (measured with 500V insulation tester)
4.3) LEVELING THE MACHINE
4.3.1) Leveling the device
1) leveling
-
Use the adjusting bolts installed at the four
stands to level the machine (front, rear, left,
and right). Use a level gauge.
Adjusting bolts
Level gauge
Stand
Level base
Check if the input voltage of the machine corresponds with the voltage supply before
installing or operating the machine.
WARNING
1) Make sure to check the voltage supply where the machine will be installed.
2) Install the cable away from the operator’s work space to prevent accident or injury.
WARNING
The machine must be accurately leveled (especially front-back) to prevent machine from
deformation or needle from moving out of position.
CAUTION
Содержание SWF/TA-WJ614-100
Страница 51: ...52 6 Frill bobbin embroidery User direction 7 Standing bobbin embroidery User direction ...
Страница 60: ...61 11 1 2 Outside the Control Box Terminal for tape reader and winder Fuse for picker solenoid power ...
Страница 63: ...64 11 4 TRIMMING MOTOR DRIVE DC power Signal cable Motor control cable AC power ...