32
10
、
Connect power supply and terminal according to circuit diagram. And make sure
the phase of the connection is correct and the grounding is reliable.
The wiring of the circuit must be connected by a professional electrician
Ensure that the power supply voltage is same with the lift requirements
Make sure the phase connection is correct and that the wrong connection will burn out the motor
and not be covered by the warranty
Pump stations must be kept dry
11
、
Installation of the arm. Insert the arm into the transverse slot of the carriage
,
aim
the holes in the carriage’s horizontal tube and the holes of the arm shaft and insert the
arm shaft and then put the circlips on the end of the arm shaft. Then install tray,
auxiliary tray, etc.
4.6 Test and adjustment
1
、
Please confirm before starting:
Make sure the column is vertical and the arm is horizontal.
Make sure the expansion bolt is fastened.
To ensure that the power supply voltage and motor nameplate requirements are
consistent.
Содержание QJ-Y-2-35
Страница 1: ...0 2 Post Lift Instruction Manual Model No QJ Y 2 35...
Страница 7: ...6 Chapter II Safety instructions...
Страница 9: ...8 2 2 The warning signs...
Страница 10: ...9...
Страница 18: ...17...
Страница 19: ...18 1 Hex nuts M20 8 2 Wire rope 2 Pump station connection diagram...
Страница 25: ...24...
Страница 26: ...25...
Страница 27: ...26 Above is the drawing of parts of point a and b...
Страница 29: ...28 Above is the drawing of parts at point c...
Страница 30: ...29 Above is the drawing of parts at point e and f...
Страница 40: ...39 7 3 Hydraulic principle diagram Interface schematic 7 4Pump station decomposition diagram...
Страница 46: ...45 Company saved...
Страница 47: ...46...
Страница 48: ...47...
Страница 49: ...48...
Страница 50: ...49...
Страница 51: ...50...
Страница 56: ...55 99 15040000006steel rope 8 8665 2 10091011140920Channel section steel 1...