Lift must be installed on a minimum thickness of 250 mm, a minimum strength of
300PSI concrete ground.
Specifications of concrete must be strictly enforced, otherwise it will cause
a serious accident.
Installation ground should be level. Should supplement the small uneven
ground level. If the concrete level tolerance is big, should consider re-pouring
concrete.
4.5 Installation
1
、
According to the instructions in the packing list, to check if is missing parts or
damage parts.
2
、
According to foundation chart (Fig.2) to install lift. Using chalk to draw the
installation range of column lift.
Содержание QJ-Y-2-35
Страница 1: ...0 2 Post Lift Instruction Manual Model No QJ Y 2 35...
Страница 7: ...6 Chapter II Safety instructions...
Страница 9: ...8 2 2 The warning signs...
Страница 10: ...9...
Страница 18: ...17...
Страница 19: ...18 1 Hex nuts M20 8 2 Wire rope 2 Pump station connection diagram...
Страница 25: ...24...
Страница 26: ...25...
Страница 27: ...26 Above is the drawing of parts of point a and b...
Страница 29: ...28 Above is the drawing of parts at point c...
Страница 30: ...29 Above is the drawing of parts at point e and f...
Страница 40: ...39 7 3 Hydraulic principle diagram Interface schematic 7 4Pump station decomposition diagram...
Страница 46: ...45 Company saved...
Страница 47: ...46...
Страница 48: ...47...
Страница 49: ...48...
Страница 50: ...49...
Страница 51: ...50...
Страница 56: ...55 99 15040000006steel rope 8 8665 2 10091011140920Channel section steel 1...