11
Chapter III Method of Packaging and Handling
3.1 Packing way
:
The lift is packed to be several parts as below:
1 The lift body is wrapped in steel frame, completely covered by unbreakable material,
include all body parts.
2 Power unit and electrical control box (some models without electronic control box)
is packed in cardboard box.
3 We will provide some optional accessories for some client's special requirement.
3.2 lifting and loading
、
transport:
1 When lifting and loading, must use woven nylon tape with loading-bear strength no
less than 2 tons, and to the center of gravity, to avoid the tape placed in mechanical lock
position. See the Fig. As below.
2. Right equipment and methods must be chose when loading and unloading. Also
ensure the parts is no missing and consider package size
、
weight
、
center of gravity
and breakable parts.
3. Lift must be placed flat and avoid direct sunlight in the warehouse.moisture-proof.
Temperature is -10°C to +40°C.
Содержание QJ-Y-2-35
Страница 1: ...0 2 Post Lift Instruction Manual Model No QJ Y 2 35...
Страница 7: ...6 Chapter II Safety instructions...
Страница 9: ...8 2 2 The warning signs...
Страница 10: ...9...
Страница 18: ...17...
Страница 19: ...18 1 Hex nuts M20 8 2 Wire rope 2 Pump station connection diagram...
Страница 25: ...24...
Страница 26: ...25...
Страница 27: ...26 Above is the drawing of parts of point a and b...
Страница 29: ...28 Above is the drawing of parts at point c...
Страница 30: ...29 Above is the drawing of parts at point e and f...
Страница 40: ...39 7 3 Hydraulic principle diagram Interface schematic 7 4Pump station decomposition diagram...
Страница 46: ...45 Company saved...
Страница 47: ...46...
Страница 48: ...47...
Страница 49: ...48...
Страница 50: ...49...
Страница 51: ...50...
Страница 56: ...55 99 15040000006steel rope 8 8665 2 10091011140920Channel section steel 1...