33
Make sure the electrical system is connected correctly and has good grounding.
Make sure the hydraulic pipe is connected correctly.
Ensure adequate space for people and goods in the work area
。
2
、
The tank capacity is 10 L
,
fill N46 (SY1227-84) hydraulic oil into the tank of the
pumping station and the oil quantity should be between the top and bottom of the fuel
tank scale.
As low winter temperatures, hydraulic oil is more viscous, if necessary, you can choose
more than 32 # 40 # The following high-pressure anti-wear hydraulic oil. filling
lithium grease (GB7324-87) in the internal slider of slider touches , requires top-down
uniform filling
3
、
First click
up
button and check whether there is oil on the oil outset within
5seconds.If there's no oil proves the motor reverses, Any two-phase adjustment of the
power steering motor is ok. Press the up button and slider can be increased and repeated
lifting several times, the highest and lowest position, measuring if the height of the two
Содержание QJ-Y-2-35
Страница 1: ...0 2 Post Lift Instruction Manual Model No QJ Y 2 35...
Страница 7: ...6 Chapter II Safety instructions...
Страница 9: ...8 2 2 The warning signs...
Страница 10: ...9...
Страница 18: ...17...
Страница 19: ...18 1 Hex nuts M20 8 2 Wire rope 2 Pump station connection diagram...
Страница 25: ...24...
Страница 26: ...25...
Страница 27: ...26 Above is the drawing of parts of point a and b...
Страница 29: ...28 Above is the drawing of parts at point c...
Страница 30: ...29 Above is the drawing of parts at point e and f...
Страница 40: ...39 7 3 Hydraulic principle diagram Interface schematic 7 4Pump station decomposition diagram...
Страница 46: ...45 Company saved...
Страница 47: ...46...
Страница 48: ...47...
Страница 49: ...48...
Страница 50: ...49...
Страница 51: ...50...
Страница 56: ...55 99 15040000006steel rope 8 8665 2 10091011140920Channel section steel 1...