November
2015
Hardware Pack for Step 4
PART #
DESCRIPTION
QTY
LINE DRAWING
AA
M6 x 15mm bolt
32 PCS
BB
M6 washer
32 PCS
GG
M5 x 15 mm bolt
32 PCS
II
Φ
8 x 260 stake
12 PCS
Fig.25:
Attach Wheels (H) to Movable door 1 (long, left) (F1), Movable door 2 (long, right) (F2), Movable door 3 (short, left) (G1) and Movable door 4
(short, right) (G2) using M5 x 15 mm bolts (GG).
Fig.26:
Attach Rail track 2 (long, upper right) (I2) to Movable door 2 (long, right) (F2) through Wheel (H) as per above fig. Repeat this step for Rail
track 4 (short, upper right) (I4) to Movable door 4 (short, right) (G2). (
Note: The door with IN label should face inside
)
Fig.27:
Put the wheel at the bottom of Movable door 2 (long, right) (F2) into Slide rail 2 (long, lower right) (A2). Repeat this step for Movable door 4
(short, right) (G2) to Slide rail 4 (short, lower right) (A4). (
Note: The screen toward inside
)
Fig.28:
Attach Rail track 2 (long, upper right) (I2) to Gutter 2 (long, right) (D2) using M6 x 15 mm bolts (AA) and M6 washers (BB). Repeat this step
for attaching Rail track 4 (short, upper right) (I4) to Gutter 4 (short, right) (D4).