November
2015
PART #
DESCRIPTION
QTY
LINE DRAWING
AA
M6 x 15mm bolt
32 PCS
BB
M6 washer
42 PCS
CC
M6 x 25mm bolt
10PCS
Hardware Pack for Step 2
Fig.9:
When assembling step 2, 2 people and 2 ladders are required. (It is same for assembling Bar 2 (middle) (M2))
Fig.9-1:
Attach the top of Bar 1 (corner) (M1) to Connector 5 (roof) (L) using M6 x 15 mm bolts (AA) and M6 washers (BB).
Fig.10:
Attach the bottom of Bar 1 (corner) (M1) to Connector 4 (J2) using M6 x 15 mm bolts (AA) and M6 washers (BB).
Fig.11:
Attach the top of Bar 2 (middle) (M2) to Connector 5 (roof) (L) using M6 x 15 mm bolts (AA) and M6 washers (BB).
Fig.7-1:
Attach Connector 3 (J1) to assembled Gutter 3 (short, left) (D3) and Gutter 4 (short, right) (D4) using M6 x 15 mm bolts (AA) and M6
washers (BB).
Fig.7-2:
Attach Connector 3 (J1) to assembled Gutter1 (long, left) (D1) and Gutter 2 (long, right) (D2) using M6 x 15 mm bolts (AA) and M6
washers (BB).
Fig.8:
Attach Connector 4 (J2) to each corner of screen room using M6 x 15 mm bolts (AA) and M6 washers (BB).