Installation and Operation Manual
SA-07-11-87, Rev A
58
January 2019
INDEX
Auxiliaries, 5
Chemical Use, 4
Common Parts List, 54
Control Checklist, 6
Controlling the Pump During Startup, 15
Cryogenic Applications, 11
Cryogenic Seal Installation, 47
Disassembling the LMV-803, 20, 23
Dismantling Precautions, 19
Driver Instructions, 5
Driver Rotation Check, 5
Electrical Installation, 12
Electrical Safety, 4
Entrained Gases, 16
Equipment and Safety, 3
Explosion/Fire Hazard
, 4
Fall Protection, 4
Inspection, 8
INSTALLATION, 8
Installation and Start-Up Checklist, 7
ISO 9001, 3
Lifting, 3
Liquid Buffer System, 11
Lubrication, 13
Machine Guarding, 4
MAINTENANCE, 19
Minimum Flow Conditions, 16
Moving the Unit, 20
Operating Conditions, 6
Operation of Sundyne Pumps, 16
Parallel Operation Control, 15, 17
Personal Protective Equipment, 3
Piping Connections, 5
Pre-Commission Checklist, 5
Pressurizing Fluid Loop, 6
Pump Diagnostics, 50
Pump Familiarization, 5
Pump Removal from Pipe Work, 19
Reassembling the LMV-803Lr, 33
Seal Environmental Control System, 10, 11
Setting the Valves, 6
Shaft and Lip Seal, 30
Shimming the Extended Motor Shaft and Bearing
Box Assembly, 44
Single Operation Control, 15
SPECIFICATIONS, 53
START UP, 14
Start Up Checklist, 6
Start-Up Procedures, 14
Storing Your Pump Long-Term, 8
Storing Your Pump Short-Term, 8
Suction and Discharge Piping, 9
Suction Conditions, 16
Sundyne Centrifugal Pumps, 1
System Head Curve, 17
Testing the Equipment, 4
Text Symbols, 2
TROUBLESHOOTING, 50
Using Forklifts, 3
Venting, 6