page 35
©
Suncast Corporation
Step 99: Install painted trim piece on top of strip keeping all edges
flush as shown.
Step 101: Attach painted 1x4 to
5/8” plywood piece using 2” trim
nails as shown (keep all edges
flush).
Step 96: Layout door trim pieces
as shown.
Door Trim Material List:
2 - 3-1/2”x73-1/2” 5/8 plywood
1 - 3-1/2”x78-3/4” 5/8 plywood
2 - 1”x4”x73-1/2” painted trim
1 - 1”x4”x78-3/4” painted trim
1 - 1”x3”x81” painted trim
Door Trim Installation
Step 97: Make a mark 3/4”
above door header at both ends
of door opening.
Step 98: Fasten unpainted door
trim strip aligning with edge of
siding and with mark.
Step 100: Repeat previous steps
making sure door trim is spaced
71-3/4” apart.
Step 102: Attach 1x3x81” flat on
top of 1x4 trim piece as shown.
Step 103: Install top door trim
piece and properly align as
shown.
Содержание Keystone Garage
Страница 10: ...Page 10...
Страница 14: ...Page 13b...
Страница 19: ...End Wall Layout One Window Configuration 2 Page 18...
Страница 20: ...End Wall Layout Two Windows Configuration 3 Page 19...
Страница 21: ...Optional Garage Door Layout Configuration 4 Page 20...
Страница 28: ...Rafter Layout Page 27...
Страница 45: ...page 44 Door Stop Installation Step 140 Install door stop on both doors as Suncast Corporation...