Step 80: Layout gable overhang
pieces as shown.
White plywood goes on bottom,
OSB goes on top.
Gable Overhang Assembly & Installation
Step 77: Fasten OSB to
rafters making sure raf-
ters are spaced evenly
at 16” on center.
Step 78: Install remaining OSB pieces and repeat
on back side.
Note: Make sure to stagger OSB joints to maxi-
mize roof strength.
Step 79: Paint building
desired color (paint pur-
chased separately).
Note: Trim pieces
included are primed
white, you can paint
the trim a different
color to suit your
taste. It is easiest to
paint trim prior to
installing.
Step 81: Assemble gable overhang keeping OSB flush at bottom and edges. Fasten OSB to rafters
using 7d 2-1/4” nails every 8”.
©
Suncast Corporation
page 30
Содержание Keystone Garage
Страница 10: ...Page 10...
Страница 14: ...Page 13b...
Страница 19: ...End Wall Layout One Window Configuration 2 Page 18...
Страница 20: ...End Wall Layout Two Windows Configuration 3 Page 19...
Страница 21: ...Optional Garage Door Layout Configuration 4 Page 20...
Страница 28: ...Rafter Layout Page 27...
Страница 45: ...page 44 Door Stop Installation Step 140 Install door stop on both doors as Suncast Corporation...