Step 35: Nail wall together using 12d 3” nails as shown.
Step 36: Begin with 4’x90” sid-
ing pieces on either side of door,
keeping 1/2” away from edge
of 2x4. Nail 4’x90” across top
only and only
one nail at bot-
tom doorway corner of siding
piece.
Note: Left side of door should
have siding underlap.
Note: Right side of door
should have siding overlap.
Step 38: Before nailing rest of
siding, make sure that door
opening is square. Door is
square when corner to corner
diagonal measurements are
equal (approximately 99”).
Step 37: Install 16-3/4”x4’ siding
piece at top of door way -
nail
across top only.
page 15
©
Suncast Corporation
Siding Measurements:
2 - 1’x90”, 4 - 4’x90”
2 - 16-3/4”x4’ (for top of door)
1/2”
Reveal
3/4”
Reveal
One Nail
Here
4’x90”
1’x90”
16-3/4”x4’
Содержание Keystone Garage
Страница 10: ...Page 10...
Страница 14: ...Page 13b...
Страница 19: ...End Wall Layout One Window Configuration 2 Page 18...
Страница 20: ...End Wall Layout Two Windows Configuration 3 Page 19...
Страница 21: ...Optional Garage Door Layout Configuration 4 Page 20...
Страница 28: ...Rafter Layout Page 27...
Страница 45: ...page 44 Door Stop Installation Step 140 Install door stop on both doors as Suncast Corporation...