![Suncast Keystone Garage Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/suncast/keystone-garage/keystone-garage_assembly-manual_1395200023.webp)
Page 22
Step 45: Make a mark at both ends of wall even with bottom of sid-
ing and snap a line. Hammer 4 nails spaced approximately 2’ apart
on line.
Do not hammer nails all the way in, keep out - 3/4”.
©
Suncast Corporation
Step 47: Install 4’x90” sheet of siding by resting it on nails along bot-
tom. Align siding piece at top and edge of front wall stud
(not with
edge of siding)
, left siding splice should fall on the center of wall
stud. Start with 20”x90” on opposite (right) wall.
Sidewall Siding Installation
Step 46: Layout three
4’x90”siding sheets and one
20”x90” sheet as shown.
Step 48: Make sure siding aligns
properly at edge of wall. Nail off
siding every 8” using 7d 2-1/4”
galvanized nails.
Step 49: Each rafter set consists
of two rafters and two gussets,
with the exception of both end
rafters which include only one
gusset.
Rafter Assembly
Incorrect, birds mouth should be
at bottom end of rafter.
If your unit configuration does not include a garage door, repeat previous steps on opposite
gable wall making sure to use correct gable wall configuration. If your unit does include a
garage door, please proceed to page 45 to install gable end wall with garage door opening.
Flush with
front wall
stud
Содержание Keystone Garage
Страница 10: ...Page 10...
Страница 14: ...Page 13b...
Страница 19: ...End Wall Layout One Window Configuration 2 Page 18...
Страница 20: ...End Wall Layout Two Windows Configuration 3 Page 19...
Страница 21: ...Optional Garage Door Layout Configuration 4 Page 20...
Страница 28: ...Rafter Layout Page 27...
Страница 45: ...page 44 Door Stop Installation Step 140 Install door stop on both doors as Suncast Corporation...