52
Sun Fire V880 Server Rackmounting Guide • May 2004
3. Make sure the tray assembly is level.
Use a level to ensure the tray assembly is level front-to-back and left-to-right.
Adjust as necessary.
4. Once the tray assembly is level, completely tighten all of the bracket screws.
Tighten the eight M6 screws that secure the front and rear brackets to the vertical
cabinet rails.
5. Slide the tray assembly in and out of the cabinet to be sure the slides operate
smoothly.
Installing the Server Into the Tray
Assembly
1. Be sure the cabinet is stabilized so that the cabinet cannot move or tip forward
when the tray is extended and the server is placed on the tray.
Stabilize the cabinet by implementing the stabilizing features of the Sun Rack 900
cabinet that are appropriate for your site. See the instructions provided with the Sun
Rack 900 cabinet to implement the stabilizing features.
Caution –
Before you slide the tray out, be sure the cabinet is stabilized so that it
cannot move or tip forward. See the cabinet documentation for information about
stabilizing the cabinet.
!
The Sun Rack 900 cabinet is equipped
with an anti-tilt bar at the front center of
Anti-tilt bar
the cabinet. See the cabinet documentation
for stabilizing instructions.
Содержание Sun Fire V890
Страница 9: ...Preface ix...
Страница 10: ...x Sun Fire V890 Server Rackmounting Guide May 2004...
Страница 44: ...34 Sun Fire V890 Server Rackmounting Guide May 2004...
Страница 70: ...60 Sun Fire V880 Server Rackmounting Guide May 2004...
Страница 102: ...92 Sun Fire V890 Server Rackmounting Guide May 2004...