Chapter 3
Installing the Server Into the Sun Rack 900 Cabinet
57
8. Check that the server is level and centered on the tray.
Use a level and adjust the server position if necessary.
9. Tighten the eight M4 screws that secure the server to the tray assembly.
Restoring the Server
1. A qualified service technician must install the CPU/Memory boards and fan trays
that were removed before you installed the server into the cabinet.
See the
Sun Fire V890 Server Service Manual
for installation instructions.
2. If you removed the server’s side doors, replace them.
Caution –
Avoid keeping the server’s doors open for extended periods while the
system is operating. Server doors must be closed to prevent automatic thermal
shutdown.
3. Close both of the server’s side doors securely.
4. Slide the tray assembly into the cabinet.
5. Install the power supplies that you removed before you installed the server into
the cabinet.
See the
Sun Fire V890 Server Service Manual
for installation instructions.
!
Содержание Sun Fire V890
Страница 9: ...Preface ix...
Страница 10: ...x Sun Fire V890 Server Rackmounting Guide May 2004...
Страница 44: ...34 Sun Fire V890 Server Rackmounting Guide May 2004...
Страница 70: ...60 Sun Fire V880 Server Rackmounting Guide May 2004...
Страница 102: ...92 Sun Fire V890 Server Rackmounting Guide May 2004...