Chapter 1
Getting Started
3
The kit contains a plastic bag holding 10-32 screws (black in color) and M4 screws.
You will use these screws to install the tray assembly and server into the cabinet.
The following figure shows the screws at actual size.
Any screws not used in the rack installation are spares.
Note –
Bar nuts are required (but not included) for non-threaded cabinets. See the
cabinet instructions for more information.
Tray assembly
Cable management
Lifting handles (4)
Trim strips (2)
Cable management
bracket for cabinet
bracket for server
Tie
wraps
Power jumper cords (3)
10-32 screw
M4 screw
(Black in color)
Содержание Sun Fire V890
Страница 9: ...Preface ix...
Страница 10: ...x Sun Fire V890 Server Rackmounting Guide May 2004...
Страница 44: ...34 Sun Fire V890 Server Rackmounting Guide May 2004...
Страница 70: ...60 Sun Fire V880 Server Rackmounting Guide May 2004...
Страница 102: ...92 Sun Fire V890 Server Rackmounting Guide May 2004...