74
Sun Fire V890 Server Rackmounting Guide • May 2004
Preparing the Cabinet
Make sure the operating location complies with the Sun Fire V890 server
requirements and the cabinet requirements. See
of this guide and the
cabinet documentation for information.
1. Be sure the cabinet is stabilized so that the cabinet cannot move or tip forward.
If there are feet beneath the cabinet to prevent it from rolling, be sure the feet are
fully extended downward to the floor.
Stabilize the cabinet using the stabilizing mechanisms provided with the cabinet.
See the instructions provided with the cabinet.
2. Open the front and rear doors.
See the instructions provided with the cabinet.
3. Remove (if applicable) the front and rear doors and the side panels of the cabinet.
See the instructions provided with the cabinet.
Installing the Tray Assembly Into the
Cabinet
To install the tray assembly into the cabinet, complete these tasks:
■
If necessary, adjust the rear brackets on the tray assembly slides for the depth of
the cabinet. See
“Adjust the Rear Brackets” on page 75
■
Determine the vertical position of the server in the cabinet. See
Vertical Position of the Server in the Cabinet” on page 77
■
Attach the tray assembly to the cabinet rails. See
.
Содержание Sun Fire V890
Страница 9: ...Preface ix...
Страница 10: ...x Sun Fire V890 Server Rackmounting Guide May 2004...
Страница 44: ...34 Sun Fire V890 Server Rackmounting Guide May 2004...
Страница 70: ...60 Sun Fire V880 Server Rackmounting Guide May 2004...
Страница 102: ...92 Sun Fire V890 Server Rackmounting Guide May 2004...