![Sun Microsystems SPARCcenter 2000 Скачать руководство пользователя страница 43](http://html1.mh-extra.com/html/sun-microsystems/sparccenter-2000/sparccenter-2000_installation-manual_1392453043.webp)
4-1
Powering the System On and Off
4
Use the instructions in this chapter to power on and off the system.
Note – The use of an ASCII terminal is recommended for installation. See
Section 3.5, “Connecting an ASCII Terminal” for terminal settings and
connections.
4.1 Powering On the System
Caution – For Solaris 2.X users: before powering on the system for the first
time, read Section 3.3, “Precautions for JumpStart Automatic Installation.”
To power on the SPARCcenter 2000 system:
1. Begin with a safety inspection of the system:
a. Turn the system key switch to
(the standby position).
See Figure 4-1.
Note – The standby position ( ) does not turn off any AC-powered drive trays
in the lower part of the system cabinet. The key switch controls only the DC
power supply and DC-powered devices in the main cabinet.
b. Turn the AC distribution unit power switch to Off.
The AC distribution unit is at the rear of the cabinet. See Figure 4-2.
!
Содержание SPARCcenter 2000
Страница 8: ...viii SPARCcenter 2000 2000E Installation Manual June 1996 ...
Страница 14: ...xiv SPARCcenter 2000 2000E Installation Manual June 1996 ...
Страница 28: ...1 14 SPARCcenter 2000 2000E Installation Manual June 1996 1 ...
Страница 54: ...Index 4 SPARCcenter 2000 2000E Installation Manual June 1996 ...
Страница 56: ...SPARCcenter 2000 2000E Installation Manual June 1996 ...