56
Netra ft 1800 Installation Guide • February 1999
4. Push the other On system switch (on the other CAF front panel).
FIGURE 4-1
System Switches (Front Panel)
The PSU, CPUset and CAF Power LEDs will successively light, and the terminal will
display the output from the Power On Self Test (POST). The POST sequence may
take some time.
The CPUset LEDs will perform their own test sequence towards the end of the POST
procedure, then the Target LED on one of the CPUsets will flash as the OBP
ok
prompt appears.
CAF
On
switch
Standby
switch
Содержание Netra ft 1800
Страница 6: ...vi Netra ft 1800 Installation Guide February 1999 ...
Страница 10: ...x Netra ft 1800 Installation Guide February 1999 ...
Страница 40: ...26 Netra ft 1800 Installation Guide February 1999 FIGURE 2 12 Removing a CPUset Module ...
Страница 41: ...Chapter 2 Hardware Installation 27 CAF Modules FIGURE 2 13 Removing a CAF ...
Страница 42: ...28 Netra ft 1800 Installation Guide February 1999 PCI Modules FIGURE 2 14 Removing a PCI Card Carrier ...
Страница 43: ...Chapter 2 Hardware Installation 29 PSU Modules FIGURE 2 15 Removing a Power Supply ...
Страница 45: ...Chapter 2 Hardware Installation 31 FIGURE 2 16 Removing an RMM Module ...
Страница 56: ...42 Netra ft 1800 Installation Guide February 1999 ...
Страница 90: ...76 Netra ft 1800 Installation Guide February 1999 W weight empty chassis 6 maximum 2 removable modules 6 ...