Chapter 1
Before Installation
5
FIGURE 1-2
Netra ft 1800 Airflow Requirements (Internal)
Front
Rear
Front
Rear
Front
Fan unit
CPU
PSU
PSU
PSU
PSU
PSU
PSU
CPU
CPU
CAF
CAF
CAF
CAF
Min. 75 mm between
front of system and
rack door (if fitted)
Min. 2U (90 mm)
gap at top of
system
Min. 2U (90 mm)
gap at base of
system
Содержание Netra ft 1800
Страница 6: ...vi Netra ft 1800 Installation Guide February 1999 ...
Страница 10: ...x Netra ft 1800 Installation Guide February 1999 ...
Страница 40: ...26 Netra ft 1800 Installation Guide February 1999 FIGURE 2 12 Removing a CPUset Module ...
Страница 41: ...Chapter 2 Hardware Installation 27 CAF Modules FIGURE 2 13 Removing a CAF ...
Страница 42: ...28 Netra ft 1800 Installation Guide February 1999 PCI Modules FIGURE 2 14 Removing a PCI Card Carrier ...
Страница 43: ...Chapter 2 Hardware Installation 29 PSU Modules FIGURE 2 15 Removing a Power Supply ...
Страница 45: ...Chapter 2 Hardware Installation 31 FIGURE 2 16 Removing an RMM Module ...
Страница 56: ...42 Netra ft 1800 Installation Guide February 1999 ...
Страница 90: ...76 Netra ft 1800 Installation Guide February 1999 W weight empty chassis 6 maximum 2 removable modules 6 ...